Design
A senior engineer walks the building, gets the brief straight, and hands back a full design — AP placements, cable schedules, port maps, VLAN layout, and an itemised bill of materials — before anyone installs a thing.
- Predictive heatmap · AP placement checked before purchase
- Written bill of materials · every SKU itemised
- Cutover window agreed before we touch the rack




